DH41 20241123 13 22 42 Pro
At DownsSteam work restoration work has started. The cooling system and its canopy have been removed form the short end and the diesel engine has been removed from the long end along with most of the bodywork. The bogies have been removed and the loco is on stands. Part of the long end chassis has been sandblasted and undercoated. November 2024
More information
Visible by: Everyone
All rights reserved
-
Taken on Saturday November 23, 2024
-
Posted on Sunday November 24, 2024
- 23 visits
- 3 people like
0 comments