'HFF' - trail footpath - Redmires dams.
A seemingly pointless stone pillar - along a track close to the ''Redmires dams'' is one of three 'sighting towers' and used during construction of a 4.5 mile [ 7.24 KM ] tunnel deep below,. The tunnel was built 1903 - 1910 to distribute water by gravity from the 'Ladybower dam' to supplement the 'Rivelin dam',. over the full length the water falls by a mere 6 ft.6" / 198 cm..
More information
Visible by: Everyone
All rights reserved
-
Taken on Tuesday May 2, 2023
-
Posted on Thursday May 4, 2023
- 165 visits
- 31 people like
66 comments
Christa1004 said:
David G Johnson replied to Christa1004:
Fred Fouarge said:
David G Johnson replied to Fred Fouarge:
Frode said:
David G Johnson replied to Frode:
Annemarie said:
I wish you a HFF and a serene weekend
David G Johnson replied to Annemarie:
Loose_Grip/Pete said:
HFF David & have a great w/e.
David G Johnson replied to Loose_Grip/Pete:
Jaap van 't Veen said:
hFF
David G Johnson replied to Jaap van 't Veen:
Trudy Tuinstra said:
Nicolas Mertens said:
Xata said: