Curing 20240323 14 51 56 Pro
Over several days the cast bricks cure. As sufficient strength is achieved the mold frames are disassembled and the brick is placed on a pallet for further curing. The generally rainy weather during this time meant the curing took a couple of days longer than expected. March 2024.
See PiP.