Stone mason at work!
Using stones from knocking holes in existing stone walls, the one metre drop below the new floor level and the ground is being built up to match the existing external surface of the building.
More information
Visible by: Everyone
All rights reserved
-
Taken on Monday November 5, 2012
-
Posted on Wednesday May 29, 2013
- 96 visits
0 comments