Loading

Xcel Energy 13.8kV

The sub-transmission has long since been downgraded to 13.8kV.

These are feeders out of the Oak Park Heights Sub (OPK).
Visible by: Everyone
(more information)

More information

Visible by: Everyone

All rights reserved

Report this photo as inappropriate