bri - Pooley Bridge [1794 to 2015]
The stone arches of the bridge at Pooley Bridge.
This was erected in 1764 {replacing an earlier bridge from the 16th century}. It was washed away on 6 December 2015 when Cumbria was hit by heavy flooding during Storm Desmond, after storm waters scoured the riverbed from around & under the bridge piers.
More information
Visible by: Everyone
All rights reserved
-
Taken on Sunday October 29, 2006
-
Posted on Sunday December 1, 2024
- 15 visits
- 3 people like
1 comment
StoneRoad2013 said: