SVR Highley Shropshire 17th September 2022
Shrouded in steam the signalman & the fireman from British Railways Standard 4 4-6-0 75069 exchange single-line staffs. The fireman is giving up the one from Hampton Loade while the signalman is handing over the staff to the next crossing point at Arley to the south.
A late afternoon scene on the Saturday of the SVR Autumn Gala.
More information
Visible by: Everyone
All rights reserved
-
Taken on Saturday September 17, 2022
-
Posted on Tuesday November 22, 2022
- 420 visits
- 15 people like
10 comments
Peter_Private_Box said:
A wonderful and interesting picture, which I like very much!
Very nice composition
I usually go to this SVR autumn gala, but didn't this year for a number of reasons... Pity!
Best Wishes, a nice week ahead, and stay safe!!
Peter
Loose_Grip/Pete replied to Peter_Private_Box:
Roger (Grisly) said:
Loose_Grip/Pete replied to Roger (Grisly):
Amelia said:
Loose_Grip/Pete replied to Amelia:
Peter Castell said:
GrahamH said:
Loose_Grip/Pete replied to GrahamH:
GrahamH replied to Loose_Grip/Pete: