Loading

Belmont Mill from the back.

At the top of the slope, looking east. The diagonal struts were installed by the US Forest Service in 2012 to stabilize the structure.
Visible by: Everyone
(more information)

More information

Visible by: Everyone

All rights reserved

Report this photo as inappropriate