EVERSOURCE 22.9/13.2kV Y pole
In Pittsfield, MA. This circuit used to run at 8.32kV and originally this pole used to be where a transformer bank where the 22.9kV circuit used to transform down to 8.32kV before the upgrade and extension of the 22.9kV circuit in 2019