The fateful day has arrived
As of August 14th, I happen to be driving down a road not far from my place until I spotted some linework going on. Seems that Xcel is upgrading a 19.9 / 7.9kv (line gets stepped down at a trans. pole) branch line to a new three phase 34.5kv circuit on FIBERGLASS ARMS!!!!!!!! I've taken a lot of interest in NSP / Xcel's 34.5 system since it was always the type that caught my attention, and I was hoping that this day would never come. NOT a single pole with wooden arms or braces in sight!
1 comment
David Dahle said: